European Grids Package

Action type

LawA policy initiative is one tracked policy action. The action type names the instrument the Commission is using to deliver it. See full glossary →

Status

Delivered

Delivery date

10 Dec 2025

Record content last updated:

On this page

Summary

The European Grid Package will fast-track expansion and modernisation of transmission and distribution networks, deepening market integration and lowering bills. It streamlines TEN-E, accelerates permitting — including environmental assessments — and mandates integrated, cross-border planning with effective cost-sharing, focusing on interconnectors and distribution grids. It prioritises digitalisation, flexibility and efficient use of existing assets, while increasing visibility of manufacturing supply needs. An EIB “grids manufacturing package” (≈€1.5 bn) will underpin EU component capacity, and an “Energy Highways” effort will tackle critical bottlenecks. Together, the measures unlock renewables and storage, strengthen security of supply, and support electrification at least cost.

Action items

  • Eight Energy Highways

  • 1. Pyrenean crossing 1 and Pyrenean crossing 2 [Better integrate the Iberian Peninsula with power interconnectors across the Pyrenees to France]

  • 2. Great Sea Interconnector [Connect Cyprus with continental Europe to end its electricity isolation]

  • 3. Harmony Link [Strengthen power links with the Baltic states]

  • 4. TransBalkan Pipeline (TBP) reverse flow [Improve energy supplies in the Balkan region and eastern neighboring states]

  • 5. Bornholm Energy Island [Turn the Baltic Sea into an offshore interconnector hub]

  • 6. Improve price stability and energy security in southeastern Europe

  • 7. SoutH2 Corridor [The South hydrogen corridor]

  • 8. Southwest hydrogen corridor from Portugal to Germany

Referenced policy initiatives or strategic plans (0)

No entries are recorded for this collection.

Strategic plans and policy initiatives citing this one (4)

4 shown · 4 of 4 entries